LANDSCAPE, URBAN, INTERIOR, ARCHITECTURE - DESIGNS
Commenced during the year 2009
Project Name
Development of Sardar Sarovar Dam and Environs, Kevadia.
Project Coordinator
Project Sponsor
Sardar Sarovar Narmada Nigam Ltd. (SSNNL)
Project Period
March 2009 onwards
Project Description

 

Institute team will be working on tourism related proposed projects at Kevadia. Broadly, following will be covered.

  1. Swagat-sthal & near by area
  2. Chamri Block
  3. Nehru Foundation Stone place.
  4. Ice-land Dyke -4
  5. ViewPointNo. 1
  6. ViewPointNo. 2
  7. Crocodile Point
  8. Colour Scheme & Signages.
Project Name
Ravitalization of the Ghodasar Lake Precinct, Ahmedabad.
Project Coordinator
Project Sponsor
Ahmedabad Municipal Corporation (AMC)
Project Period
March 2009 onwards.
Project Description

 The Ghodasar Lake precinct would serve as an important recreational space for the south-eastern part of the city of Ahmedabad and the immediate neighborhood. The project would include both open and built spaces to support such an use. The project will be conceived such that its operation would be with AMC and maintenance would be with a contractor. The main features of the project shall include:

  1. The lake (With water to its full capacity and partially filled).
  2. The lake edge/promenade.
  3. Landscaped garden.
  4. Amphitheatre.
  5. Sitting/gathering spaces.
  6. Children play areas.
  7. ruksh Vatika (tree plantation)
  8. Public amenities and parking.

 The project will address the needs of the community like passive recreation, gathering spaces, play areas, improved health, entertainment etc.

Project Name
Architectural consultancy for the Museum at VADNAGAR (North Gujarat).
Project Coordinator
Project Sponsor
Department of Museums, Gujarat State
Project Period
June 2009 onwards
Project Description

 The institute team will work on this project through following stages.

  • Concept design
  • Preliminary design and drawings
  • Drawings for clients / statutory approvals
  • Working drawings and tender documents
  • Appointment of contractors –Advice
  • Construction – supervision
  • Completion.
Project Name
Design and Development of Educatinment Games for School Children
Project Coordinator
Project Sponsor
Gujarat Energy Development Agency (GEDA), Govt. of Gujarat
Project Period
April 2009 onwards
Project Description

Our institute research team will be working on following aspects.:-

  • Will identify and improve upon the existing games and will develop prototypes for existing games in consultation with GEDA.
  • Will develop additional five games and will prepare prototype of these newly develop games in consultation with GEDA.
  • Will conduct two rounds of testing of all the games with the school children and will modify the games after the test runs.
  • Will submit a detailed report, prototypes and their manual as playing instructions along with an estimate of the budget to mass produce them and their specifications to GEDA after the completion of this exercise.